(8) Production (AA)

 0    32 fiche    crajsis
ladda ner mp3 skriva ut spela Kontrollera dig själv
 
Fråga English Svar English
Key stages in the manufacturing process
börja lära sig
Planning, Sequencing, Scheduling, Dispatching, Loading, Monitoring
Designing machines to do multiple tasks; reprogramming machine tools while they are running
börja lära sig
flexible manufacturing
Tailoring products to meet the needs of a large number of individual customers
börja lära sig
mass customisation
internal technical standards, ISO 9000 family, Six Sigma
börja lära sig
quality standards
Production process: work in progress without stopping
börja lära sig
continuous process
proces ciągły
Production process: groups of products of the same type move through the process
börja lära sig
batch process
produkcja partiowa
Production process: low volume, opportunities for customisation
börja lära sig
job production
produkcja jednostkowa
Types of production process
börja lära sig
continuous process, mass process, batch process, job production, project
introducing materials to an operation so it can begin
börja lära sig
loading
authorising a task to begin
börja lära sig
dispatching
bringing together customer demand with operational issues of volume, timing, materials, etc.
börja lära sig
planning
checking progress and solving problems
börja lära sig
monitoring
deciding when tasks should start and finish
börja lära sig
scheduling
deciding which workstation will carry out which task in which order
börja lära sig
sequencing
when equipment (or the whole line) stops working and production is lost
börja lära sig
downtime
czas przestoju
time between one job / batch finishing and the next one beginning (includes time taken to prepare machinery for the new process)
börja lära sig
changeover time
czas zmiany
time required from receiving a customer order to final delivery; it includes order processing, pre-pack time, in-transit time, receiving and inspection
börja lära sig
lead time
okres realizacji zamówienia
time taken for a given job / batch to pass through all the operations needed
börja lära sig
cycle time
extra hours that someone works, beyond their contractual obligation (and often paid at a higher rate)
börja lära sig
overtime
nadgodziny
time taken to prepare machinery and equipment for a new job / batch
börja lära sig
set-up time
time required from the initial concept for a new product to when it first goes on sale
börja lära sig
time-to-market
czas wprowadzenia produktu (na rynek)
any period of delay between one event and another (e.g. between giving an instruction and the operation beginning)
börja lära sig
lag time
czas zwłoki
A specific problem that causes delays to a whole process is called a...
wąskie gardło
börja lära sig
A specific problem that causes delays to a whole process is called a 'bottleneck'
The amount of work that can be dealt with in a particular time period is the...
börja lära sig
The amount of work that can be dealt with in a particular time period is the 'throughput'
Actual output divided by potential output is ... (e.g. room occupancy rates in a hotel)
börja lära sig
Actual output divided by potential output is 'capacity utilisation' (e.g. room occupancy rates in a hotel)
wykorzystanie mocy produkcyjnych
A product that serves its intended function, without any extra features, is described as...
börja lära sig
A product that serves its intended function, without any extra features, is described as 'fit-for-purpose'
dostosowany do potrzeb, odpowiadający potrzebom
If a product has good quality in relationship to its price, then it is...
börja lära sig
If a product has good quality in relationship to its price, then it is 'good value-for-money'
towar wart swojej ceny
The characteristic of 'always working well' is...
börja lära sig
The characteristic of 'always working well' is 'reliability'
The characteristic of 'lasting a long time' is...
börja lära sig
The characteristic of 'lasting a long time' is durability
A fault in the way something is made is a...
börja lära sig
A fault in the way something is made is a 'defect'
requiring a lot of finance
börja lära sig
capital-intensive
requiring a lot of manpower
börja lära sig
labour-intensive

Du måste vara inloggad för att skriva en kommentar.