Fråga |
Svar |
Purposes of budget planning # - multi-question börja lära sig
|
|
Planning. | Authorisation. | Delegation. | Evaluation. | Motivation. | Communication. | Co-ordination. | Control. PADEM CCC
|
|
|
börja lära sig
|
|
A budget that is IMPOSED on the budget holder by senior management.
|
|
|
Advantages of top-down budget: # börja lära sig
|
|
Slack avoiding. | High-level management retain control. | Inexperience managers bad decisions avoiding. | Dysfunctional behaviour avoiding. | Occasionally quicker. SHIDO tłum
|
|
|
Bottom-up budget involves... börja lära sig
|
|
divisional managers participating in the setting of the budgets.
|
|
|
Advantages of bottom-up budgets: # börja lära sig
|
|
Time of senior management released. | Local knowledge using. | Understanding of divisional managers increased. | Motivation improved. TŁUM shido
|
|
|
börja lära sig
|
|
When a budget is prepared for single level of activity.
|
|
|
Flexible budget definition: börja lära sig
|
|
Prepared with the cost behaviour of all elements known and classified as either fixed of variable. The budget may be flexed to the actual level of activity.
|
|
|
Rolling budget definition: börja lära sig
|
|
Kept continually up to date by adding another period when the earliest period has expired.
|
|
|
Incremental budget definition: börja lära sig
|
|
Starts with previous period's budget or actual results and adds or subtracts an INCREMENTAL AMOUNT.
|
|
|
Activity-based budgeting characteristics (ABB): 2cz börja lära sig
|
|
Uses the principles of ABC | to estimate the firm's future demand for RESOURCES so can help the firm to acquire these resources more efficiently.
|
|
|
Steps involved in Activity-Based Budgeting 5 steps börja lära sig
|
|
1. Estimate the production and sales volumes. 2. Estimate the demand for activities. 3. Determine the types of resources required. SV - DA - DR - RQ - TA 4. Estimate the quantity of each resource. 5. Take action to adjust the capacity of resources to match projected supply.
|
|
|
5 börja lära sig
|
|
Recognises that complexity and diversity result in overheads not all driven by activity level. | More accurate cost per unit. | Understanding of what drives costs resulting in better: - pricing - cost control - decision making. C C PCD
|
|
|
# börja lära sig
|
|
Time and cost. | Advantages limited if OVERHEADS minimal or mainly driven by level of production. | Customers may not tolerate 3 changes*. | Advantages limited if activity costs already well controlled. TACA * price increases, | changes to product range or specification.
|
|
|
Activity-based management (ABM) is: 4cz börja lära sig
|
|
Method of evaluating ACTIVITIES | that a business performs using ABC to carry out | a value chain analysis or BPR | to improve strategic and operational decisions in an organisation. ABM
|
|
|
Zero-based Budgeting definition: ZBB börja lära sig
|
|
A budgeting that requires each cost element to be specifically justified, as though the activities to which the budget relates were being undertaken for the first time. Without approval, the budget allowance is zero.
|
|
|
4 steps börja lära sig
|
|
1. Managers specify for their responsibility centres those activities that can be individually evaluated. 2. Describe each of the individual activities in a decision package*. 3. Evaluate and rank each package**. 4. Allocate resources to various packages. **usually using cost/benefit analysis. *which should state the costs and benefits expected AND be drawn up in such way that it can be evaluated and ranked.
|
|
|
# börja lära sig
|
|
Obsolete or inefficient operations can be identified and ended. | Business environment changes responding. | Resources allocated economically. | Understanding a cost-behaviour | Staff involvement at all levels increased. majster OBRUS
|
|
|
# börja lära sig
|
|
Management skills needed. | Activities difficult to compare. | Judgemental nature of packages rankings. | Short-termism. | Time and cost. | Enormous demotivation due to time spent. | Rigidity of budgeting process danger. MAJSTER obrus
|
|
|
Rolling budgets advantages: # börja lära sig
|
|
Serious treatment of budgeting process improved. | Information of PM is better. | Accurateness is improved. | Relevance much better by the end of the traditional budgeting period. RB - SIAR dla-t
|
|
|
Rolling budgets disadvantages. # börja lära sig
|
|
Demotivating as the targets are changing regularly. | Last budget 'Plus or minus a bit' danger. | Actual results weaker controlled.* | Time-consuming. RB - siar DLA-T. *Due to increase in budgeting work time expense.
|
|
|
2 börja lära sig
|
|
Planning | and Operational.
|
|
|
Planning variance definition: börja lära sig
|
|
The difference between the original an the revised budget (uncontrollable by line manager).
|
|
|
Operational variance definition: börja lära sig
|
|
The difference between the revised standard and the actual performance (controllable by line manager).
|
|
|
Operational ABM is about: börja lära sig
|
|
using ABC information to improve efficiency. Those activities which add value to the product can be identified and improved. Activities that don’t add value are the ones that need to be reduced to cut costs without reducing product value.
|
|
|
börja lära sig
|
|
using ABC information to decide which products to develop and which activities to use. This can also be used for customer profitability analysis, identifying which customers are the most profitable and focusing on them more.
|
|
|